Shree L. R. Tiwari College of Engineering

Laboratory

  • Facility: Dual Trace CRO, Spectrometers, Newton’s Ring Apparatus with Travelling Microscope, Hall Effect Apparatus, Digital Gauss meter, Fiber Optic Trainer Kit , Function Generators, Red Helium Neon Laser, Optical Bench, Ultrasonic distance meter, e /m Apparatus etc.
  • Area: 85 Sq. Mtr.
  • Use: Used by All divisions of FE.

  • Area: 102 Sq. Mtrs.
  • Use: Used by All divisions of FE.
  • Facility: Digital Conduct Meter, Spectrophotometer, TLC, Apparatus, pH Meter (digital),Muffle Furnace with Digital Temperature Indicator, Hot Air Over , Desiccators, Weighing Balance (digital), Distillation Unit, Bunshen Heavy Duty with Stop Cock Burner etc.
  • Area: 87 Sq. Mtr.
  • Use: Used by All divisions of FE.
  • Facility: Series and Parallel Resonance kit , Half wave and Full wave rectifier kit, Common Emitter Transistor Characteristics kit, Apparatus of three phase system in STAR and DELTA connection , Apparatus of power and phase measurement in three phase system by two Wattmeter method , Load test on single phase step down transformer , Lamp load  bank , CROs.

  • Area: 68 Sq. Mtr.
  • Use: Used by All divisions of FE.
  • Facility: Simple and Compound Pendulum, Fly Wheel, Differential Pulley, Universal Force Table,  Friction Apparatus, Parallel Beam Apparatus , Bell crank lever, Jib crane apparatus, etc.

  • Area: 165 Sq. Mtr.
  • Use: Used by All divisions of FE.
  • Facility: Drawing Desk, Stools, Green Board, Faculty Desk & Chair, Fans and Tubes, etc.

  • PC: Lenovo Think Centre (Intel Chipset, Intel Core i3-550 Processor (3.2GHz 1333MHz FSB 4MB L2 Cache) 73W, 4GB PC3-10600 1333 MHz DDR3 SDRAM DIMM, 500GB 7200RPM SATA HDD, Intel Integrated Graphics, Intel Gigabit Ethernet, Chassis Intrusion Switch, with 18.5 INCH Wide Lenovo Monitor)
  • System Software: Windows 7 Enterprise (32 Bit) License
  • Application Software: 30 AutoCAD-11 software Licenses , Solid Works 12, Ansys 14.5, Turbo C 4,, Java 1.8, MS Office-13, Net beans 7.
  • Network: Star Topology (Ethernet Switch D-Link: DGS-1024D 24-Port Gigabit, Unmanaged Desktop Switch10/100 mbps.)
  • Devices: 60
  • Intercom no.: 226

  • PC: Lenovo Think Centre (Intel Chipset, Intel Core i3-550 Processor (3.2GHz 1333MHz FSB 4MB L2 Cache) 73W, 4GB PC3-10600 1333 MHz DDR3 SDRAM DIMM, 500GB 7200RPM SATA HDD, Intel Integrated Graphics, Intel Gigabit Ethernet, Chassis Intrusion Switch, with 18.5 INCH Wide Lenovo Monitor)
  • System Software: Windows 7 Enterprise (32 Bit) License
  • Application Software: Turbo C 4, Java 1.8, MS Office-13, SciLab 5.
  • Network: Directly connected to server room Core Switch.
  • Devices: 02
  • Intercom no.: 225

 

  • Area: 9 X 9 Sq. Mtr.
  • Use: Used by All divisions of FE.
  • Facility: 20 Educational Desk, LCD Projector (Shared), Projection Screen, Green Board, Faculty Desk & Chair, Fans and Tubes, Lockers,etc.
Language lab or an English lab is equipped with ETNL Software . A language lab is a system that converts a passive language class into an active listening and speaking based learning environment; in short, it is intended to improve students’ confidence in public speaking by removing stage fright. The Language Lab is used from FE to BE.
  • Area: 9 X 9 Sq. Mtr.
  • Use: Used by All divisions of FE.
  • Facility: 20 Educational Desk, LCD Projector (Shared), Projection Screen, Green Board, Faculty Desk & Chair, Fans and Tubes, Lockers,etc.

  • Area: 267 Sq. Mtr.
  • Use: Used by All divisions of FE.
  • Facility: Bench Drilling Machine, Welding Transformer, Bench Grinding Machine, Wood Turning Lathe Machine, Metal Shearing Machine, Mitutoyo Vernier Caliper, Mitutoyo Vernier Height Gauge, Bench vice, Electrical PCB  Hand Drill machine.
Scroll to Top